- Postcode districts
- CT1, CT2, CT5, CT6
- Nearby
- Whitstable, Herne Bay and Faversham
- Guide price
- £6,700–£13,500
- Typical time on site
- 5–10 working days
- Water
- Very hard across most of Kent
- Survey
- Free, at your home
What does a wet room cost in Canterbury?
In Canterbury, a wet room typically costs £6,700–£13,500 including VAT, based on South East England prices. Prices in South East England run at about 12% above the national guide, mainly because of labour rates. The figure depends on the size of the room, whether anything moves, and the products you pick.
Compact
- Full tanking, porcelain tiles
Signature
- 4–7 m² room
Large or luxury
- Large-format or stone-effect tiles
Guide prices for Canterbury including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Canterbury
We work right across Canterbury — CT1, CT2, CT5 and 1 more postcode districts — and in neighbouring Whitstable and Herne Bay.
In a city the size of Canterbury, parking and access for a skip are worth sorting before the start date — we will ask at the survey. If you are planning a wet room in Canterbury for level access, we design the fall and drain so the floor is flush from the doorway. If your Canterbury home has a concrete ground floor, a downstairs wet room may need the screed cut out to set the drain.
Most of Kent has very hard water. If your supply in Canterbury is the same, limescale on shower glass and heads is a real issue: easy-clean glass, rub-clean nozzles and a squeegee make a big difference. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- Floor strengthening or a ply overlay on timber floors so the surface does not flex
- Slip-resistant porcelain floor tiles and wall tiling
- A frameless glass screen fixed to the wall and floor
- A thermostatic shower valve, exposed or concealed, with heads to suit your water system
Decisions to make first
Underfloor heating
Electric underfloor heating under the tiles dries the floor quickly after a shower; it is typically £700 to £1,500 for a bathroom.
Former or screed
A pre-formed board gives a consistent fall and suits timber floors. A sand and cement screed suits concrete slabs and larger shower areas.
Rules that apply in England
In England, a new drain connection or changes at the soil stack can be building-regulations work under Part H, and new circuits or changes to the wiring in the room are notifiable under Part P. If the wet room is a newly formed bathroom, Approved Document F requires extract of 15 litres per second intermittent or 8 litres per second continuous.

