- Postcode districts
- TS6, TS10
- Nearby
- Guisborough, Middlesbrough and Hartlepool
- Guide price
- £5,600–£11,250
- Typical time on site
- 5–10 working days
- Water
- Moderately hard across most of North Yorkshire
- Survey
- Free, at your home
What does a wet room cost in Redcar?
Guide price in Redcar: £5,600–£11,250 including VAT, depending on the room and what you choose. Prices in Yorkshire and the Humber run at about 7% below the national guide, mainly because of labour rates. The figure depends on the size of the room, whether anything moves, and the products you pick.
Compact
- Full tanking, porcelain tiles
Signature
- 4–7 m² room
Large or luxury
- Large-format or stone-effect tiles
Guide prices for Redcar including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Redcar
We work right across Redcar — TS6 and TS10 — and in neighbouring Guisborough and Middlesbrough.
Homes in and around Redcar vary, so we look at the floor, the walls and the water system before we price anything. If you are planning a wet room in Redcar for level access, we design the fall and drain so the floor is flush from the doorway. In a compact Redcar bathroom, a wet room frees the space a tray and enclosure would take, but expect the whole floor to get wet.
Supplies across most of North Yorkshire are moderately hard. A quick wipe of the glass and an easy-clean coating are worth having on a new shower in Redcar. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- A frameless glass screen fixed to the wall and floor
- Strip-out, waste removal, a final flow test to the drain and handover
- Slip-resistant porcelain floor tiles and wall tiling
- Floor strengthening or a ply overlay on timber floors so the surface does not flex
Decisions to make first
Open or screened
A fully open shower with no glass only works in a larger room, with the basin, WC and towels well away from the spray.
Underfloor heating
Electric underfloor heating under the tiles dries the floor quickly after a shower; it is typically £700 to £1,500 for a bathroom.
Rules that apply in England
In England, a new drain connection or changes at the soil stack can be building-regulations work under Part H, and new circuits or changes to the wiring in the room are notifiable under Part P. If the wet room is a newly formed bathroom, Approved Document F requires extract of 15 litres per second intermittent or 8 litres per second continuous.

