- Postcode districts
- GU7
- Nearby
- Guildford, Haslemere and Aldershot
- Guide price
- £6,700–£13,500
- Typical time on site
- 5–10 working days
- Water
- Hard across most of Surrey
- Survey
- Free, at your home
What does a wet room cost in Godalming?
In Godalming, a wet room typically costs £6,700–£13,500 including VAT, based on South East England prices. Labour costs in South East England put local prices at about 12% above the UK guide figure. The figure depends on the size of the room, whether anything moves, and the products you pick.
Compact
- Under about 4 m²
Signature
- Frameless screen, thermostatic shower
Large or luxury
- Concealed valves, feature lighting
Guide prices for Godalming including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Godalming
We work right across Godalming — GU7 — and in neighbouring Guildford and Haslemere.
Being a smaller town does not change how we work in Godalming: free survey, written quote, one team. If your Godalming home has a concrete ground floor, a downstairs wet room may need the screed cut out to set the drain. For a wet room in a Godalming flat, the first step is the lease, because freeholder consent is often needed before any work starts.
Most of Surrey has hard water. If your supply in Godalming is the same, limescale on shower glass and heads is a real issue: easy-clean glass, rub-clean nozzles and a squeegee make a big difference. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- Floor strengthening or a ply overlay on timber floors so the surface does not flex
- A frameless glass screen fixed to the wall and floor
- Strip-out, waste removal, a final flow test to the drain and handover
- Extractor fan and lighting by a qualified electrician, tested and certified, with underfloor heating if you choose it
Decisions to make first
Underfloor heating
Electric underfloor heating under the tiles dries the floor quickly after a shower; it is typically £700 to £1,500 for a bathroom.
Floor tile
Matt or textured porcelain with good slip resistance. Mosaic gives extra grip on a centre-drain floor because of its many grout lines.
Rules that apply in England
In England, a new drain connection or changes at the soil stack can be building-regulations work under Part H, and new circuits or changes to the wiring in the room are notifiable under Part P. If the wet room is a newly formed bathroom, Approved Document F requires extract of 15 litres per second intermittent or 8 litres per second continuous.

