- Postcode districts
- DE72, NG9, NG10
- Nearby
- Ilkeston, Nottingham and West Bridgford
- Guide price
- Included with supply and fit
- Typical time on site
- survey visit plus design
- Water
- Moderately hard across most of Derbyshire
- Survey
- Free, at your home
What does a new bathroom design cost in Long Eaton?
Design comes with the job: the survey, layout and itemised quote are free. In Long Eaton, a complete designed, supplied and fitted bathroom typically costs £6,200–£11,500 including VAT. Labour costs in East Midlands put local prices at about 4% below the UK guide figure. The figure depends on the size of the room, whether anything moves, and the products you pick.
Survey and layout
- Measured survey at home
Detailed design
- Product schedule
Full project
- Typical supply-and-fit total
Guide prices for Long Eaton including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Long Eaton
We work right across Long Eaton — DE72, NG9 and NG10 — and in neighbouring Ilkeston and Nottingham.
In Long Eaton, as anywhere, the age of the house decides a lot: pipe sizes, floor construction and where the soil stack runs. For loft rooms and sloping ceilings in Long Eaton homes, the design checks head height where you stand, not just the floor area. If you are in Long Eaton and weighing a bath against a walk-in shower, the layout options show both with their prices.
Water across much of Derbyshire is moderately hard. Easy-clean glass and good-quality brassware are money well spent. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- Layout options drawn to scale, showing the bath or shower, WC, basin, storage and towel rail
- A lighting and electrical plan showing switches, fittings, shaver socket and extractor fan
- A clear view of which changes are cheap and which mean moving drainage or opening floors
- A conversation about who uses the room, when, and what does not work about the current one
Decisions to make first
Keep or change the layout
Keeping the WC and shower where they are saves on plumbing. The WC is the costly one to move, because it is tied to the soil stack.
Where the shower goes
A shower on an outside wall is easier to ventilate; one under a sloping ceiling needs full head height where you stand, not just at the high side.
Rules that apply in England
In England, a new connection to the soil stack or new drainage can be building regulations work under Part H, and new circuits or alterations to circuits in the bathroom are notifiable under Part P. Where a new bathroom is formed, Approved Document F asks for extract at 15 l/s intermittent or 8 l/s continuous.

