What does a new bathroom design cost in Brentwood?
Design comes with the job: the survey, layout and itemised quote are free. In Brentwood, a complete designed, supplied and fitted bathroom typically costs £6,900–£12,750 including VAT. Labour costs in East of England put local prices at about 6% above the UK guide figure. The figure depends on the size of the room, whether anything moves, and the products you pick.
Survey and layout
- Layout options on paper
Detailed design
- Lighting and electrical plan
Full project
- Design, supply and fit
Guide prices for Brentwood including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Brentwood
We work right across Brentwood — CM13, CM14 and CM15 — and in neighbouring Billericay and Hornchurch.
Homes in and around Brentwood vary, so we look at the floor, the walls and the water system before we price anything. Whether you are in Brentwood or elsewhere in Essex, layout options come with an itemised written quote. A design survey in Brentwood covers drainage, supplies, electrics and ventilation, so nothing on the drawing is guesswork.
Most of Essex has very hard water. We plan easy-clean glass, rimless toilets and finishes that do not show limescale. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- Elevations and tile layouts on a design, supply and fit project, so the setting-out is agreed before tiling starts
- Checks on the soil stack, waste routes, joist direction, water pressure, hot water system and existing electrics
- A lighting and electrical plan showing switches, fittings, shaver socket and extractor fan
- A written, itemised quote, with the price fixed in writing once the layout and products are agreed
Decisions to make first
Keep or change the layout
Keeping the WC and shower where they are saves on plumbing. The WC is the costly one to move, because it is tied to the soil stack.
Planning for later
Timber noggins in the walls for future grab rails, a wider door or a level shower floor cost far less to build in now than to add later.
Rules that apply in England
In England, a new connection to the soil stack or new drainage can be building regulations work under Part H, and new circuits or alterations to circuits in the bathroom are notifiable under Part P. Where a new bathroom is formed, Approved Document F asks for extract at 15 l/s intermittent or 8 l/s continuous.