- Postcode districts
- TQ4, TQ5
- Nearby
- Paignton, Torquay and Newton Abbot
- Guide price
- £45–£90 per m²
- Typical time on site
- 2–4 working days
- Water
- Soft across most of Devon
- Survey
- Free, at your home
What does bathroom tiling cost in Brixham?
Guide price in Brixham: £45–£90 per m² including VAT, depending on the room and what you choose. The figure depends on the size of the room, whether anything moves, and the products you pick.
Ceramic
- Grout and trims
Porcelain
- Porcelain walls and floor
Large-format or stone
- Mitred edges, niches
Guide prices for Brixham including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Brixham
We cover every part of Brixham, including TQ4 and TQ5, and nearby Paignton (3.7 miles) and Torquay (4.7 miles).
Brixham gets the same process as anywhere else: a free survey at your home and a written, itemised quote. Tiling quotes in Brixham list the tile, the area and the preparation separately, so you can compare like for like. If you want a tiled shower floor in your Brixham bathroom, the tanking and drainage are planned before the tile is chosen.
Most of Devon is supplied with soft water. Soft water is kind to grout, so mid-tone and darker grouts stay looking fresh. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- Tanking the shower area and the walls around the bath with a waterproof membrane or liquid system
- Checking walls for flatness and strength, and boarding with cement-based backer board where needed
- Grouting, trims or mitred edges, and silicone at internal corners, the bath and the tray
- Fixing with an adhesive suited to the tile and the surface, with levelling clips for large tiles
Decisions to make first
Edges
Metal or PVC trims are quick and protect tile edges. Mitred edges look cleaner on porcelain and take more labour.
Floor grip
For a bathroom floor, choose a matt or textured tile with a slip rating of R10 or above. Smaller tiles with more grout lines grip better in a shower.
Rules that apply in England
In England, tiling itself is not building regulations work. If it is part of forming a level shower floor with new drainage, that drainage can be Part H work, and any new electrics are covered by Part P.

