- Postcode districts
- TQ1, TQ2, TQ3, TQ4
- Nearby
- Paignton, Brixham and Newton Abbot
- Guide price
- £45–£90 per m²
- Typical time on site
- 2–4 working days
- Water
- Soft across most of Devon
- Survey
- Free, at your home
What does bathroom tiling cost in Torquay?
Guide price in Torquay: £45–£90 per m² including VAT, depending on the room and what you choose. The figure depends on the size of the room, whether anything moves, and the products you pick.
Ceramic
- Wet areas or half height
Porcelain
- Levelling system for large tiles
Large-format or stone
- Large-format porcelain or natural stone
Guide prices for Torquay including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Torquay
As well as Torquay itself (TQ1, TQ2, TQ3 and 1 more postcode districts), we survey in Paignton, Brixham and Newton Abbot.
In Torquay, as anywhere, the age of the house decides a lot: pipe sizes, floor construction and where the soil stack runs. If your Torquay home has hard water, larger tiles and epoxy grout leave fewer joints for limescale to build up in. If you want a tiled shower floor in your Torquay bathroom, the tanking and drainage are planned before the tile is chosen.
Water across much of Devon is soft. Soft water is kind to grout, so mid-tone and darker grouts stay looking fresh. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- Setting out so cuts are even and joints line up with niches, windows and edges
- Measuring wall and floor areas and working out quantities with an allowance for cuts
- Sealing natural stone and cleaning off grout haze before handover
- Checking walls for flatness and strength, and boarding with cement-based backer board where needed
Decisions to make first
Tile size
Large-format tiles mean fewer grout lines but need flat walls and more preparation. Small tiles and mosaics follow uneven surfaces and grip better underfoot.
Grout
Cement-based grout is standard. Epoxy grout resists stains and mould better and suits showers, but takes longer to apply and costs more.
Rules that apply in England
In England, tiling itself is not building regulations work. If it is part of forming a level shower floor with new drainage, that drainage can be Part H work, and any new electrics are covered by Part P.

