- Postcode districts
- TQ2, TQ3, TQ4
- Nearby
- Torquay, Brixham and Newton Abbot
- Guide price
- £45–£90 per m²
- Typical time on site
- 2–4 working days
- Water
- Soft across most of Devon
- Survey
- Free, at your home
What does bathroom tiling cost in Paignton?
For Paignton, our guide range for bathroom tiling is £45 to £90 per m² including VAT. The figure depends on the size of the room, whether anything moves, and the products you pick.
Ceramic
- Grout and trims
Porcelain
- Porcelain walls and floor
Large-format or stone
- Mitred edges, niches
Guide prices for Paignton including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Paignton
In Paignton we cover TQ2, TQ3 and TQ4; we also cover Torquay, 2.6 miles away, and Brixham.
In Paignton, as anywhere, the age of the house decides a lot: pipe sizes, floor construction and where the soil stack runs. For Paignton flats, we check the lease and the floor build-up before laying hard tiles on a timber floor. Tiling quotes in Paignton list the tile, the area and the preparation separately, so you can compare like for like.
Supplies across most of Devon are soft. Soft water is kind to grout, so mid-tone and darker grouts stay looking fresh. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- Fixing with an adhesive suited to the tile and the surface, with levelling clips for large tiles
- Setting out so cuts are even and joints line up with niches, windows and edges
- Tanking the shower area and the walls around the bath with a waterproof membrane or liquid system
- Sealing natural stone and cleaning off grout haze before handover
Decisions to make first
Grout
Cement-based grout is standard. Epoxy grout resists stains and mould better and suits showers, but takes longer to apply and costs more.
Floor grip
For a bathroom floor, choose a matt or textured tile with a slip rating of R10 or above. Smaller tiles with more grout lines grip better in a shower.
Rules that apply in England
In England, tiling itself is not building regulations work. If it is part of forming a level shower floor with new drainage, that drainage can be Part H work, and any new electrics are covered by Part P.

