- Postcode districts
- TQ12
- Nearby
- Torquay, Paignton and Brixham
- Guide price
- £45–£90 per m²
- Typical time on site
- 2–4 working days
- Water
- Soft across most of Devon
- Survey
- Free, at your home
What does bathroom tiling cost in Newton Abbot?
Guide price in Newton Abbot: £45–£90 per m² including VAT, depending on the room and what you choose. The figure depends on the size of the room, whether anything moves, and the products you pick.
Ceramic
- Standard ceramic wall tiles
Porcelain
- Full height in wet zones
Large-format or stone
- Sealing where needed
Guide prices for Newton Abbot including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Newton Abbot
As well as Newton Abbot itself (TQ12), we survey in Torquay, Paignton and Brixham.
In Newton Abbot, as anywhere, the age of the house decides a lot: pipe sizes, floor construction and where the soil stack runs. Whatever the age of your Newton Abbot home, large-format tiles need flat walls, so the survey checks how much preparation they will take. For Newton Abbot flats, we check the lease and the floor build-up before laying hard tiles on a timber floor.
Most of Devon is supplied with soft water. Soft water is kind to grout, so mid-tone and darker grouts stay looking fresh. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- Sealing natural stone and cleaning off grout haze before handover
- Floor preparation: overlaying timber floors with ply or backer board, or levelling a screed
- Checking walls for flatness and strength, and boarding with cement-based backer board where needed
- Setting out so cuts are even and joints line up with niches, windows and edges
Decisions to make first
Edges
Metal or PVC trims are quick and protect tile edges. Mitred edges look cleaner on porcelain and take more labour.
Grout
Cement-based grout is standard. Epoxy grout resists stains and mould better and suits showers, but takes longer to apply and costs more.
Rules that apply in England
In England, tiling itself is not building regulations work. If it is part of forming a level shower floor with new drainage, that drainage can be Part H work, and any new electrics are covered by Part P.

