- Postcode districts
- PO30, PO32, PO33
- Nearby
- Cowes, Ryde and Sandown
- Guide price
- £7,300–£13,500
- Typical time on site
- 6–10 working days
- Water
- Hard across most of the Isle of Wight
- Survey
- Free, dates by arrangement
What does a fitted bathroom cost in Newport?
In Newport, a fitted bathroom typically costs £7,300–£13,500 including VAT, based on South East England prices. We adjust the national guide for South East England, where prices are typically about 12% above the UK average. Travel and delivery to islands and remote areas are priced on your quote. The figure depends on the size of the room, whether anything moves, and the products you pick.
Essential
- Quality white suite and bath or shower
Signature
- Porcelain tiles, LED lighting, extractor fan
Bespoke
- New layout or larger room
Guide prices for Newport including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Newport
In Newport we cover PO30, PO32 and PO33; we also cover Cowes, 4.2 miles away, and Ryde. Because Newport is further afield, we arrange survey visits in batches; tell us your timescale and we will confirm a date before you commit to anything.
Being a smaller town does not change how we work in Newport: free survey, written quote, one team. We survey in Newport before quoting, so the furniture run is planned around your actual walls, window and soil stack. Fitted furniture suits the many Newport bathrooms that have to hold towels, toiletries and cleaning things for a whole household.
Water across much of the Isle of Wight is hard. We plan easy-clean glass, rimless toilets and finishes that do not show limescale. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- Boarding, tanking in the wet areas, wall and floor tiling
- A free home survey with measurements, photos and a check of your water pressure, drainage and ventilation
- Strip-out of the old bathroom and removal of the waste
- First and second-fix plumbing, including concealed cistern frames and new isolation valves
Decisions to make first
Tiling height
Tiling just the wet areas keeps the cost down. Full-height tiling looks better and is easier to wipe clean.
Bath, shower or both
Keep a bath for children or soaking, swap it for a walk-in shower if no one uses it, or plan both if the room is big enough.
Rules that apply in England
In England, new circuits and most electrical changes in a bathroom are notifiable under Part P, so they must be done by an electrician registered with a competent person scheme or notified to building control. If you are adding a new extractor fan, Approved Document F gives 15 litres per second as the usual intermittent extract rate.

