- Postcode districts
- HU14, HU15
- Nearby
- Kingston upon Hull, Beverley and Scunthorpe
- Guide price
- £6,000–£12,000
- Typical time on site
- 6–12 working days
- Water
- Hard across most of the East Riding of Yorkshire
- Survey
- Free, at your home
What does a loft bathroom cost in Brough?
As a guide, budget £6,000 to £12,000 including VAT for a loft bathroom in Brough; your written quote will pin it down. Prices in Yorkshire and the Humber run at about 7% below the national guide, mainly because of labour rates. The figure depends on the size of the room, whether anything moves, and the products you pick.
Refit
- Existing loft shower room
Signature
- Fitted furniture to the eaves
New loft bathroom
- Ventilation and electrics to regulations
Guide prices for Brough including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Brough
As well as Brough itself (HU14 and HU15), we survey in Kingston upon Hull, Beverley and Scunthorpe.
Brough gets the same process as anywhere else: a free survey at your home and a written, itemised quote. If your Brough home has a gravity-drained WC on another floor, a macerator in the loft may open up more layout options. If your Brough loft shower is weak or the waste drains slowly, the fix is often in the pump or the pipe fall rather than the shower itself.
Most of the East Riding of Yorkshire has hard water. If your supply in Brough is the same, limescale on shower glass and heads is a real issue: easy-clean glass, rub-clean nozzles and a squeegee make a big difference. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- A drainage route from the loft to the soil stack with enough fall, or a pumped waste or macerator where the rules allow it
- A check of your hot-water system and of the pressure and flow you actually get at loft level
- A shower pump on a gravity system, an electric shower, or advice on moving to mains pressure, depending on your system
- A check of the floor joists where a bath or large shower tray will sit
Decisions to make first
Getting the water pressure
A pumped shower suits a gravity system with a cold tank; an electric shower heats cold mains water at the point of use; a combi or unvented cylinder gives mains pressure throughout.
Eaves storage
Low cupboards built into the slope behind the WC or basin take clutter out of the room and hide the pipework.
Rules that apply in England
In England, new drainage and a new connection to the soil stack fall under Part H, a new bathroom needs extract of 15 litres per second intermittent or 8 litres per second continuous under Approved Document F, and new circuits are notifiable under Part P. If the work includes an unvented hot-water cylinder, it must be fitted by a G3-qualified installer.

