- Postcode districts
- S5, S35, S74
- Nearby
- Hoyland Nether, Wombwell and Rawmarsh
- Guide price
- £6,000–£12,000
- Typical time on site
- 6–12 working days
- Water
- Moderately hard across most of South Yorkshire
- Survey
- Free, at your home
What does a loft bathroom cost in Chapeltown?
In Chapeltown, a loft bathroom typically costs £6,000–£12,000 including VAT, based on Yorkshire and the Humber prices. We adjust the national guide for Yorkshire and the Humber, where prices are typically about 7% below the UK average. The figure depends on the size of the room, whether anything moves, and the products you pick.
Refit
- Tiling, lighting, extractor fan
Signature
- Walk-in shower under the ridge
New loft bathroom
- New drainage route and water supply
Guide prices for Chapeltown including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Chapeltown
In Chapeltown we cover S5, S35 and S74; we also cover Hoyland Nether, 2.6 miles away, and Wombwell.
Chapeltown gets the same process as anywhere else: a free survey at your home and a written, itemised quote. If your Chapeltown home has a gravity-drained WC on another floor, a macerator in the loft may open up more layout options. We plan loft bathrooms in Chapeltown around the roof line, so the shower sits where you can stand and the eaves become storage.
Water across much of South Yorkshire is moderately hard. A quick wipe of the glass and an easy-clean coating are worth having on a new shower in Chapeltown. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- An extractor fan ducted through the roof or a gable wall, with the duct insulated through cold spaces
- Fitted furniture made to the eaves, so the low space behind the slope becomes storage
- A shower pump on a gravity system, an electric shower, or advice on moving to mains pressure, depending on your system
- A check of the floor joists where a bath or large shower tray will sit
Decisions to make first
Where the shower goes
Under the ridge or in a dormer, where the full height is. A walk-in shower with a single panel is usually easier to fit to a roof line than a framed enclosure.
Eaves storage
Low cupboards built into the slope behind the WC or basin take clutter out of the room and hide the pipework.
Rules that apply in England
In England, new drainage and a new connection to the soil stack fall under Part H, a new bathroom needs extract of 15 litres per second intermittent or 8 litres per second continuous under Approved Document F, and new circuits are notifiable under Part P. If the work includes an unvented hot-water cylinder, it must be fitted by a G3-qualified installer.

