Free home survey & written quote · Fitted bathrooms across England, Wales, Scotland & Northern Ireland0800 088 6341
Fitted Bathrooms
Scotland

Shower installation in Greater Glasgow

Shower installation in Greater Glasgow: guide prices for the Scotland area, what the work involves, and the towns we cover.

£450–£3,400 inc VAThalf a day to 3 days9 towns listed
Thermostatic shower valve and rainfall head being installed

What does a new shower cost in Greater Glasgow?

Our guide range in Greater Glasgow is £450–£3,400 including VAT. Prices in Greater Glasgow run at about 4% below the UK guide, based on Scotland labour rates.

Shower swap

£450–£950
  • Like-for-like mixer or electric shower

New shower with enclosure

£1,450–£3,400
  • Tiling to the enclosure

Guide prices for Greater Glasgow including VAT. Your itemised written quote after the free survey is the price that counts.

Which towns do we cover in Greater Glasgow?

Supplies across most of Greater Glasgow are soft. If that holds for your street in Glasgow, limescale on shower glass and heads builds up slowly and a squeegee after use is usually enough. Hardness varies street by street, so check the figure for your postcode with your water supplier. If your Glasgow bath has no shower over it, a thermostatic bar shower, screen and tiling can usually be added in a day or two.

What the job includes

  • New pipework and isolation valves, plus a pump only where the system is gravity-fed from a cold tank
  • A check of your hot-water system, water pressure and flow rate
  • Supply and fitting of the shower valve or unit, riser rail, handset or fixed head
  • For an electric shower, a check of the consumer unit and whether a new dedicated circuit is needed
  • Removal of the old shower, a full-flow test and a handover on isolating and descaling it
  • A bath screen, tray or enclosure where the shower is new

Decisions to make first

Power shower

A mixer with a built-in pump, for tank-fed systems only. It lifts a weak gravity shower but must never be connected to the mains.

Digital shower

A wall panel sets the exact temperature and flow, while the mixing valve sits out of sight. It needs a power supply and suits a clean, concealed look.

Thermostatic mixer

Blends hot and cold from your system and holds the temperature steady when someone runs a tap. The usual choice with a combi or an unvented cylinder.

Exposed or concealed

An exposed bar valve fixes onto the tiles and is easy to service. A concealed valve sits in the wall for a cleaner look but needs careful setting-out and a plan for access.

Rules that apply in Scotland

The water fittings regulations in each nation do not allow a pump to be connected directly to the mains supply; shower pumps are for gravity systems with a cold tank only. The shower must also be protected against water flowing back into the supply. Electrics must meet BS 7671, with 30 mA RCD protection and at least IPX4 fittings in zone 1, or IPX5 where water jets are used.

In Scotland there is no Part P, but a new shower circuit must still be designed, installed and certified to BS 7671. Water fittings, including pumps and backflow protection, are covered by the Scottish Water Byelaws 2014.

Shower installation in Greater Glasgow: questions

How much does a new shower cost in Greater Glasgow?

A new shower in Greater Glasgow typically costs £450–£3,400 including VAT, based on Scotland prices. The free survey and itemised written quote give you the exact figure for your home.

Which towns in Greater Glasgow do you cover?

We cover the whole of Greater Glasgow, including Glasgow, Bearsden, Newton Mearns, Clydebank, Vale of Leven, Bishopbriggs, Dumbarton and Kirkintilloch. If your town is not listed, we still cover it — get in touch with your postcode.

How long does a new shower take?

Most jobs take half a day to 3 days on site once the products have arrived. We confirm a start date and a day-by-day plan when you approve the quote.

Is the water hard in Greater Glasgow?

Supplies across most of Greater Glasgow are soft. If that holds for your street in Glasgow, limescale on shower glass and heads builds up slowly and a squeegee after use is usually enough. Hardness varies street by street, so check the figure for your postcode with your water supplier.

Does an electric shower need its own circuit?

Almost always. An electric shower draws a large current, so it needs a dedicated circuit from the consumer unit, often 40 to 45 amps for an 8.5 to 10.5 kW unit, with RCD protection. In England and Wales a new circuit is notifiable work. Swapping like for like onto an adequate existing circuit is simpler.

Shower installation in Greater Glasgow

Book a free home survey anywhere in Greater Glasgow. You get a measured layout and an itemised written price.