- Postcode districts
- NW2, NW6, NW11
- Nearby
- Kilburn, Willesden and Finchley
- Guide price
- £750–£2,200
- Typical time on site
- 1–2 working days
- Water
- Very hard across most of Greater London
- Survey
- Free, at your home
What does a bathroom strip-out cost in Cricklewood?
For Cricklewood, our guide range for a bathroom strip-out is £750 to £2,200 including VAT. We adjust the national guide for London, where prices are typically about 25% above the UK average. The figure depends on the size of the room, whether anything moves, and the products you pick.
Strip-out only
- Waste taken away
Strip-out and prep
- Walls boarded or patched
Back to brick
- Rotten timber found and repaired
Guide prices for Cricklewood including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Cricklewood
In Cricklewood we cover NW2, NW6 and NW11; we also cover Kilburn, 1.1 miles away, and Willesden.
London homes in Cricklewood often mean stairs, permits and neighbours below; we plan the logistics as carefully as the bathroom. Landlords in Cricklewood can book a strip-out to see the real condition of a damaged bathroom before choosing between a refit and a renovation. We time strip-outs in Cricklewood for just before the fit, so you are not left without a bathroom while waiting for products.
Water across much of Greater London is very hard. Hard water leaves white marks on dark grout and gloss tiles, so matt finishes and stain-resistant grout are the practical choice. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- Waste loaded and taken away by a licensed waste carrier
- The soil pipe sealed against smells once the WC is off
- Removal of the bath or shower tray, enclosure, basin, WC, furniture and accessories
- Isolating the water and capping the supply to each fitting with a proper end, then checking for leaks
Decisions to make first
Asbestos testing
In a home built before 2000, a sample test before work starts settles whether a ceiling coating, floor tile or boxing panel needs specialist removal.
Timing
Strip out just before the fit rather than weeks ahead, so the house is without a bathroom for as short a time as possible.
Rules that apply in England
In England, stripping out a bathroom does not need planning permission or building regulations approval in itself. Building regulations come in with what follows, such as new drainage under Part H or new circuits under Part P.

