- Postcode districts
- L39, WN8
- Nearby
- Maghull, Skelmersdale and Kirkby
- Guide price
- £5,600–£11,250
- Typical time on site
- 5–10 working days
- Water
- Soft across most of Lancashire
- Survey
- Free, at your home
What does a wet room cost in Ormskirk?
For Ormskirk, our guide range for a wet room is £5,600 to £11,250 including VAT. Prices in North West England run at about 6% below the national guide, mainly because of labour rates. The figure depends on the size of the room, whether anything moves, and the products you pick.
Compact
- Under about 4 m²
Signature
- Frameless screen, thermostatic shower
Large or luxury
- Concealed valves, feature lighting
Guide prices for Ormskirk including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Ormskirk
As well as Ormskirk itself (L39 and WN8), we survey in Maghull, Skelmersdale and Kirkby.
Being a smaller town does not change how we work in Ormskirk: free survey, written quote, one team. For a wet room in a Ormskirk flat, the first step is the lease, because freeholder consent is often needed before any work starts. If your Ormskirk bathroom is upstairs on timber joists, we check their size and direction before planning the wet room floor.
Most of Lancashire is supplied with soft water. If that holds for your street in Ormskirk, limescale on shower glass and heads builds up slowly and a squeegee after use is usually enough. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- A frameless glass screen fixed to the wall and floor
- Extractor fan and lighting by a qualified electrician, tested and certified, with underfloor heating if you choose it
- A pre-formed floor former with a linear or centre drain, or a screed laid to fall
- A survey of the floor construction, the joist size and direction or the concrete slab, and the route to the soil stack
Decisions to make first
Former or screed
A pre-formed board gives a consistent fall and suits timber floors. A sand and cement screed suits concrete slabs and larger shower areas.
Linear or centre drain
A linear drain along one wall lets the floor fall in a single direction, so large tiles can be laid without awkward cuts. A centre drain needs a four-way fall and suits smaller tiles or mosaic.
Rules that apply in England
In England, a new drain connection or changes at the soil stack can be building-regulations work under Part H, and new circuits or changes to the wiring in the room are notifiable under Part P. If the wet room is a newly formed bathroom, Approved Document F requires extract of 15 litres per second intermittent or 8 litres per second continuous.

